Words we do not use

Internal terms and their public equivalents, so older material and support threads still make sense.

The product has a working vocabulary and an internal one. This page is the mapping, so that if you meet an internal word — in an older thread, a support reply, or an API field — you know what it means.

Retired terms

Words that are easy to confuse

These are not renames. Both words are correct; they mean different things.

interface · surface · doc · page

Interface is what the work is returned as (a sheet, a deck, a board). Surface is the category of interface. Doc is a stored, versioned file. Page is a screen in the app.

variant · alternative · choice

Choice variable is the dimension being varied (price, timing). Variant is one built result. Alternative is an option the audit recorded as ruled out.

driver · metric

Driver is the measure a project is a bet on. Metric is also a milestone kind — a milestone that tracks a number rather than a deliverable.

task · run

Task is what you asked for. Run is one execution of it — re-running a task produces a second run.

task — four places the word appears

The product uses one word for four different things. Which one is meant follows from where you are.

  1. A task on the home page and in the Tasks tab is a request you sent and everything it produced. This is the sense every other page of these docs means, and the one the Settings for scope, modes and credits apply to.
  2. A task on a Timeline interface is one dated row — a piece of work with a start, an end and dependencies. A run can place many of them, and they are copied onto the Space timeline. An Action item in Issues is one of these.
  3. A suggested task is the grey text offered in the composer before you type: open work the Space still owes, drawn from earlier runs.
  4. A task card is a to-do with an assignee, labels, a checklist and a due date. It lives on a Board interface, in a doc's Tasks panel, or in a Tasks block inside a doc. The Settings group named Tasks configures these cards, not your runs.

When a label alone would be ambiguous — "New task", "Delete task", "Tasks" — read it against the surface it sits on: the composer and home page mean a run; a Timeline means a row; a doc sidebar or a Board means a card.